Duitse hoogspanningsmasten

Foto van hoog- en middenspanningsobjecten gemaakt die je wilt delen met het forum? Plaats 'm hier
Toliman
380 kV
Berichten: 661
Lid geworden op: 28 apr 2020 01:47

Re: Duitse hoogspanningsmasten

Bericht door Toliman » 27 sep 2023 01:54

380 kV-powerline Kupferzell-Rittershausen and 110 kV-line Niederstetten-Stalldorf/Lauda-Stalldorf running to Stalldorf substation. While the first line lost its garland-like communication cable in 2022, the second line still carries one on its ground conductor
Bijlagen
Hochspannungsleitungen_westlich_Umspannwerk_Stalldorf26092023.png
Hochspannungsleitungen_westlich_Umspannwerk_Stalldorf26092023.png (2.15 MiB) 705 keer bekeken
110kV_Leitung_westlich_Umspannwerk_Stalldorf26092023.png
110kV_Leitung_westlich_Umspannwerk_Stalldorf26092023.png (2.4 MiB) 705 keer bekeken

Toliman
380 kV
Berichten: 661
Lid geworden op: 28 apr 2020 01:47

Re: Duitse hoogspanningsmasten

Bericht door Toliman » 27 sep 2023 02:04

Stalldorf substation. Originally Stalldorf substation was a 110 kV/20 kV-substation, but in course of the expansion of renewable energy generation in the area after 2000, it was necessary to expand it into a 380 kV/110 kV/20 kV-substation. For this purpose the 380 kV-line Kupferzell-Rittershausen was looped at this point and a corresponding switchyard was built. It is planned in near future to install a second 380 kV-circuit on the corresponding line towers
Bijlagen
Umspannwerk_Stalldorf26092023_1.png
Stalldorf substation - the 380 kV-line leaving the switchyard on the left runs to Rittershausen, while that leaving on the right runs to Kupferzell
Umspannwerk_Stalldorf26092023_1.png (2.5 MiB) 705 keer bekeken
Umspannwerk_Stalldorf26092023_2.png
Umspannwerk_Stalldorf26092023_2.png (2.64 MiB) 705 keer bekeken

Toliman
380 kV
Berichten: 661
Lid geworden op: 28 apr 2020 01:47

Re: Duitse hoogspanningsmasten

Bericht door Toliman » 27 sep 2023 02:07

Tower 127A of powerline Kupferzell-Rittershausen, the last pylon before this line enters Stalldorf substation
Bijlagen
Anlage348_Mast127A_26092023.png
Anlage348_Mast127A_26092023.png (2.92 MiB) 705 keer bekeken

Toliman
380 kV
Berichten: 661
Lid geworden op: 28 apr 2020 01:47

Re: Duitse hoogspanningsmasten

Bericht door Toliman » 27 sep 2023 02:11

The 110 kV-line mentioned in my last postings entering Stalldorf substation
Bijlagen
110kV_Mast_westlich_Umspannwerk_Stalldorf26092023.png
110kV_Mast_westlich_Umspannwerk_Stalldorf26092023.png (2.82 MiB) 704 keer bekeken
Laatst gewijzigd door Toliman op 24 okt 2023 16:46, 1 keer totaal gewijzigd.

Toliman
380 kV
Berichten: 661
Lid geworden op: 28 apr 2020 01:47

Re: Duitse hoogspanningsmasten

Bericht door Toliman » 28 sep 2023 01:24

Two strainers of medium voltage power lines north of Bad Neustadt/Saale
Bijlagen
Hochspannungsleitungen_noerdlich_Bad_Neustadt27092023.JPG
Hochspannungsleitungen_noerdlich_Bad_Neustadt27092023.JPG (476.6 KiB) 668 keer bekeken

Toliman
380 kV
Berichten: 661
Lid geworden op: 28 apr 2020 01:47

Re: Duitse hoogspanningsmasten

Bericht door Toliman » 29 sep 2023 00:26

Tower 84 of powerline Kupferzell-Rittershausen. At this tower the 110 kV branch to Bad Mergentheim starts. Until 2022 the tower carried two garland-like communication cables on its pnnacle - one on the ground conductor and one on an auxiliary rope just below it. Until 2022 also only one 110 kV-circuit run on the powerline Kupferzell-Rittershausen after this pylon in the direction of Rittershausen.
Interestingly the branch to Bad Mergentheim has still a garland-like communication cable on its ground conductor.
Bijlagen
Anlage348_Mast84_28092023.png
Anlage348_Mast84_28092023.png (2.61 MiB) 629 keer bekeken

Toliman
380 kV
Berichten: 661
Lid geworden op: 28 apr 2020 01:47

Re: Duitse hoogspanningsmasten

Bericht door Toliman » 29 sep 2023 00:29

The first three pylons of the 110 kV-branch to Bad Mergentheim
Bijlagen
Anfang_des_110kV_Abzweig_nach_Bad_Mergentheim28092023.png
Anfang_des_110kV_Abzweig_nach_Bad_Mergentheim28092023.png (3.15 MiB) 628 keer bekeken

Toliman
380 kV
Berichten: 661
Lid geworden op: 28 apr 2020 01:47

Re: Duitse hoogspanningsmasten

Bericht door Toliman » 29 sep 2023 00:38

A few kilometres northward between Weikersheim-Schaftersheim and Weikersheim-Nassau one can find the Tower 102 of powerline Kupferzell-Rittershausen. Until 2022 the tower had only the upper and the middle crossbar and carried two garland-like communication cables - one at the ground conductor and one on an auxiliary rope just below it.
In 2022 the garland-like communication cables were replaced by a ground conductor with integrated communication cable and the lowest crossbar with its conductors were installed.
Bijlagen
Anlage348_Mast102_28092023.png
Anlage348_Mast102_28092023.png (2.76 MiB) 627 keer bekeken

Toliman
380 kV
Berichten: 661
Lid geworden op: 28 apr 2020 01:47

Re: Duitse hoogspanningsmasten

Bericht door Toliman » 29 sep 2023 00:52

West of the village Bronn, which belongs to Weikersheim, one can find Tower 78 of powerline Kupferzell-Rittershausen. Until 2022 it carried two garland-like communication cables on its pinnacle - one at the ground conductor and one at an auxiliary rope below it. A few years before a small 110 kV-substation was built close to it in order to feed electricity generated by nearby wind turbines in one of its 110 kV-circuits on its lowest crossbar.
Bijlagen
Anlage348_Mast78_28092023_1.png
Anlage348_Mast78_28092023_1.png (995.62 KiB) 625 keer bekeken
Anlage348_Mast78_28092023_2.png
Anlage348_Mast78_28092023_2.png (2.59 MiB) 625 keer bekeken
Anlage348_Mast78_28092023_3.png
Anlage348_Mast78_28092023_3.png (2.84 MiB) 625 keer bekeken

Toliman
380 kV
Berichten: 661
Lid geworden op: 28 apr 2020 01:47

Re: Duitse hoogspanningsmasten

Bericht door Toliman » 29 sep 2023 00:56

A close view on the small 110 kV-tower, which is used for feeding the substation close to Tower 78 of powerline Kupferzell-Rittershausen
Bijlagen
Hilfsmast_Umspannwerk_Bronn28092023.png
Hilfsmast_Umspannwerk_Bronn28092023.png (2.87 MiB) 625 keer bekeken

Plaats reactie